Refurbishment and Extension of Large Meat Production Facility

Completed Project

Acting as Principal Contractor, Demeva Refrigeration Ltd handled all aspects of the project. from planning permission and building control submission. through the design and ultimate completion and handover to the client, ahead of time and on budget.

Existing Production – Refurbishment of 34,000m3 facility, insulated panel walls. stainless steel kerbs, resin floors, refrigeration plant and electrical and mechanical installation.

New Goods In Extension – Design and build of 8,500m3 portal frame building, insulated cold room panel, specialist low temperature floors, low temperature doors. 250kW refrigeration plant. loading docks. M&E installation and HGV hardstanding.

Goods Out Extension – Design and build of 8,500m3 portal frame building. insulated cold room panel. specialist low temperature floors, low temperature doors, 200kW refrigeration plant. loading docks, M&E installation and HGV hardstanding.

New Production Hall – Design and build of 17,000m3 portal frame building. insulated panel. specialist resin floors, stainless steel drains and kerbs. insulated doors/windows, 100kW refrigeration plant and M&E installation.

Holding Freezer – Design and build of new holding freezer capacity, insulated panel, doors. specialist low temperature floors, 200kW low temperature refrigeration plant, M&E installation.

Spiral Blast Freezer – Spiral blast freezing facility, insulated enclosure, spiral conveyor, 300kW refrigeration plant and controls.