New Abattoir Production Facility

Completed Project

This project included a production hall, carcass blast chills, maturation chills, butchery cutting room, by products room, concrete kerbs, and meat hanging rail system. It involved a design and build fit out for our client and project liaison with meat rail and resin floor contractors.

Some of the equipment used included: concrete kerbs, PIR foodsafe insulated coldroom panels to production areas/chilled areas, personnel doors, crash doors, swan neck insulated doors, resin floors, stainless steel drains, meat rail hanging system.